How to keep building projects on budget: fix the brief, price fully, hold contingency, control variations and track costs. Includes a cost tracker. Fraser Bond builds and manages projects.

Controlling Construction Costs Property Investment & Wealth Building

Updated October 2026 · Fraser Bond

Costs

Controlling Construction Costs

Brief
Contingency
Variations
Tracker
In short: Construction costs are controlled before work starts: a fixed brief, full drawings, an itemised price and a contingency, followed by strict control of changes. Fraser Bond builds and project-manages schemes in London with regular cost reports.

Where budgets go wrong

Late design changes, provisional sums that grow, hidden conditions in old buildings, and delays that add preliminaries. Most overruns can be traced to decisions not made before the start.

Practical controls

  • Finish the design before pricing.
  • Hold 10–15% contingency and report on it monthly.
  • Price every variation before it is instructed.
  • Order long-lead items early.
  • Pay against measured progress, not dates.

What Fraser Bond does on building projects

  • Site visit and a clear scope of works
  • Design, drawings and specification
  • Written, itemised quote and programme
  • Planning, building control and landlord or freeholder consents
  • Managed works with one point of contact
  • Snagging, completion certificates and handover

Request a quote or a call back →

How it works

1
Visit and briefWe see the property, agree goals, budget and timing, and flag approvals early.
2
Design and cost planDrawings, specification and a cost plan you can test before committing.
3
Quote and programmeAn itemised price and a realistic programme.
4
ApprovalsPlanning, building control, party wall and freeholder or lender consents.
5
Build and handoverManaged works, cost reports, snagging and certificates.
Construction cost tracker
Current forecast–
Contingency left–
Over/under budget (%)–

Track variations against contingency every valuation.

Frequently asked questions

What contingency should I hold?

10% for new work, 15% or more for old buildings and refurbishments.

Do you provide cost reports?

Yes, with each valuation on projects we manage.

Want a project kept on budget?

Send us the address and what you need. We will arrange a visit or call and give you a written quote.

Request a quoteOur property services

Related guides

Next step

You are one message away from an answer.

If you have a question

Send it to us and get a straight answer.

Describe the property and the problem. We will tell you what we would do, what it should cost, and if we are not the right people, who is.

  • Replies the same working day
  • The person who answers is the person who handles it
  • No fee, and no obligation to instruct us
If you are looking for a property

See everything we are instructed on.

Sales and lettings across Prime Central London and the wider UK, with the same team behind every listing.

  • Residential and commercial in one search
  • Filter by borough, budget and size
  • Register once and we will send matches first