Controlling Construction Costs
Where budgets go wrong
Late design changes, provisional sums that grow, hidden conditions in old buildings, and delays that add preliminaries. Most overruns can be traced to decisions not made before the start.
Practical controls
- Finish the design before pricing.
- Hold 10–15% contingency and report on it monthly.
- Price every variation before it is instructed.
- Order long-lead items early.
- Pay against measured progress, not dates.
What Fraser Bond does on building projects
- Site visit and a clear scope of works
- Design, drawings and specification
- Written, itemised quote and programme
- Planning, building control and landlord or freeholder consents
- Managed works with one point of contact
- Snagging, completion certificates and handover
How it works
Track variations against contingency every valuation.
Frequently asked questions
Keep exploring
New-Build Houses in London: A Buyer's GuideDEVELOPMENT GUIDE
New-Build Developments in West London: A Buyer's GuideDEVELOPMENT GUIDE
How to Become a Property Developer: A Practical Guide
Browse every guide in The London Property Investor's Hub → · London area guides →
Handy tools
Stamp duty calculatorRental yield calculatorMove-in costsBTL deposit calculatorRefurb cost per m²
Ask us about end values and letting new homes.
What contingency should I hold?
10% for new work, 15% or more for old buildings and refurbishments.
Do you provide cost reports?
Yes, with each valuation on projects we manage.
Want a project kept on budget?
Send us the address and what you need. We will arrange a visit or call and give you a written quote.
Request a quoteOur property services