Updated October 2026 · Fraser Bond
Construction · Procurement
Design and build
| Design and build | Traditional | |
|---|---|---|
| Responsibility | Contractor | Split |
| Cost certainty | Earlier | Later |
| Design control | Lower | Higher |
| Speed | Faster | Slower |
Compare
Frequently asked questions
Keep exploring
New-Build Houses in London: A Buyer's GuideDEVELOPMENT GUIDE
New-Build Developments in West London: A Buyer's GuideDEVELOPMENT GUIDE
How to Become a Property Developer: A Practical Guide
Browse every guide in The London Property Investor's Hub → · London area guides →
Handy tools
Stamp duty calculatorRental yield calculatorMove-in costsBTL deposit calculatorRefurb cost per m²
Ask us about end values and letting new homes.
Is design and build cheaper?
Not always, but cost certainty is earlier.
What is novation?
Transferring the client's designers to the contractor.