Updated October 2026 · Fraser Bond
Commercial service
Modernising a Retail Unit: Renovation Guide
Planning and consents
New shopfronts and illuminated signs often need planning permission and advertisement consent, especially in conservation areas. Changing use between classes can also need permission. Tenants need the landlord's licence.
What sells the space
Clear sightlines from the door, good lighting on stock, a simple route round the shop, and a well-placed till. Storage and staff areas are easy to under-size.
For landlords
A refreshed unit can let faster. We also handle commercial lettings, so we can tell you what local retailers want.
What Fraser Bond does on building projects
- Site visit and a clear scope of works
- Design, drawings and specification
- Written, itemised quote and programme
- Planning, building control and landlord or freeholder consents
- Managed works with one point of contact
- Snagging, completion certificates and handover
How it works
Illustrative only. Get builders' quotes and a Level 3 survey.
Frequently asked questions
Keep exploring
How to Find the Right Office to Rent in LondonCOMMERCIAL GUIDE
How Much Does It Cost to Rent Office Space?COMMERCIAL GUIDE
Buying Commercial Property in the UK: A Practical Guide
Browse every guide in London Commercial Property Hub → · London area guides →
Handy tools
Stamp duty calculatorRental yield calculatorMove-in costsBTL deposit calculatorRefurb cost per m²
Tell us your requirements and we'll shortlist options.
How long does a shop fit-out take?
Small units often 3–6 weeks on site after design and consents.
Do I need planning for a new shopfront?
Often yes. Check with the council or let us handle the application.
Modernising a shop?
Send us the address and what you need. We will arrange a visit or call and give you a written quote.
Request a quoteOur property services