Office fit-out in London — the cost, and the liability it creates

The quote is for the fit-out. The bill is for the strip-out.

A London office fit-out runs from £148 to £359 a square foot depending on specification, and every published guide costs it the same way: what it takes to build. What none of them puts next to it is the obligation you sign at the same time. If your licence to alter carries a reinstatement clause, you have committed to taking it all out again — and the statutory cap that limits an ordinary dilapidations claim does not apply to reinstatement. This page costs both ends, and sets out the lease terms that decide which one you are actually agreeing to.

Nothing stored Published rates, dated Sources named Free
A fitted-out London office interior
The part of the transaction everyone photographs. The part that decides what it costs is in the licence to alter.

Three things the fit-out quote does not price

All three are lease questions rather than construction ones, which is why the contractor never raises them.

Taking it out againReinstatement runs at roughly 8% of the fit-out cost on published London benchmarks. That is not a dilapidations settlement — it is the bare strip-back — and it lands at the point you have least appetite to spend.
That the usual cap does not applySection 18(1) of the 1927 Act caps damages for repair at the loss in the value of the reversion. RICS states expressly that it does not apply to non-repair obligations including removal and reinstatement. Tenants routinely assume the cap covers everything. It does not.
That consent does not protect you“They approved the works” is not an answer. Section 19(2) expressly contemplates a reinstatement undertaking as a condition of granting consent — the licence to alter is normally exactly where the obligation is created.

What it costs to build, and what it costs to undo

Built on the published London rates for 2026, with every figure dated and attributed below. Nothing is stored and nothing is sent anywhere.

1 — The space
2 — What you are starting from
3 — The lease
4 — Anything else true?
Send us the floor and the lease

We are a property consultancy, not a fit-out contractor — the construction is done by specialists. What we do is the property side: the licence to alter, the reinstatement position, the incentive negotiation and the dilapidations exposure at the far end.

Published London rates, March 2026

Put in an area

Every fit-out guide costs the build. The number that surprises people is the one at the other end.

What to settle before you sign anything

In this order

Indicative, and not a cost plan or legal advice. Rates are whole-project benchmarks for London published by Cushman & Wakefield in March 2026, banded low, medium and high — on their methodology those figures include furniture, audio-visual and IT, and professional fees, in stated proportions. Four things we could not establish and will not invent: no professional source publishes a Cat A or Cat A+ rate per square foot, so this tool does not band that way; the guides do not state whether their rates are exclusive of VAT, so assume exclusive and check; there is no published rule of thumb for how much fit-out a landlord will fund, so we do not give one; and no professional source publishes programme length by size band. The reinstatement figure is a ratio, taken from the same guide’s own reinstatement line against its own fit-out line, which lands at about 8% across all three tiers.

The lease terms that decide what your fit-out really costs

The construction contract is the visible half of the transaction. The half that decides your total exposure is written months earlier, in documents most tenants delegate to a solicitor and never read again. Five points, each of which changes the number.

Duties you take on the moment you instruct a contractor

A tenant procuring its own fit-out becomes a client in law — twice over, under two separate regimes — and the duties are not delegable by paying somebody else.

The one that catches everybody. On a project with more than one contractor you must appoint a principal designer and a principal contractor in writing. If you do not, you have not avoided the roles — you have assumed them yourself. The same structure now applies under the building regulations regime introduced in October 2023, which created client, principal designer and principal contractor duties for regulatory compliance as well as site safety, with competence requirements attached. That regime applies to all building work needing approval, not only to tall residential buildings, which is the commonest misreading of the Building Safety Act in a commercial context.

Six things the industry still says that are out of date

Each of these appears in current fit-out marketing, including on the version of this page we are replacing. Each is checkable against the source named.

Wrong

“Commercial property must hit EPC C by 2027 and B by 2030”

Neither is law, and the first has been abandoned. The government’s interim response of 18 June 2026 confirmed that the proposed 2027 EPC C milestone will not be taken forward, and that the target is now EPC B by 2031 and only for privately rented buildings over 1,000 square metres. Buildings under that stay at E with no announced date. And none of it is legislated — it needs secondary legislation that has not been made. The binding minimum today is still EPC E.

Wrong

“The 1988 Act makes them respond to a licence to alter promptly”

It does not apply to alterations at all. The Landlord and Tenant Act 1988 covers assignment, underletting, charging and parting with possession — nothing else. So on alterations there is no statutory time limit, no duty to give written reasons, the tenant carries the burden of proving unreasonableness, and the landlord can rely on reasons it never gave you. And damages are not available — the remedy is a declaration from the court, which is slow and does not help a programme. Build the consent into your timetable rather than assuming a duty that is not there.

Wrong

“The section 18 cap limits the reinstatement claim”

It does not. Section 18(1) caps damages for covenants to repair. The RICS professional standard says in terms that it “does not apply to breaches of what are termed as ‘non-repair’ type lease obligations, including for example obligations relating to decoration, removal and reinstatement”. But do not overcorrect either. Damages are still assessed on ordinary principles, so where reinstatement would be wholly disproportionate to the benefit, recovery drops back to the loss in value. You lose the statutory cap and keep a proportionality argument.

Wrong

“A fit-out triggers a new EPC”

Generally it does not. The government’s own guide is explicit: “an internal refit with new heating, hot water, air conditioning or mechanical ventilation etc., would not trigger the requirement for an EPC” — unless the building is also modified to have more or fewer parts designed for separate use. Both limbs are needed. Where it does bite is the common case nobody expects: splitting a floor into two demises and extending the services. That triggers a new certificate, and on an older building the rating that comes back can be a problem.

Overstated

“Full expensing means 100% relief on the fit-out”

Three limits. It is companies only, new and unused assets only, and main rate plant only — and much of a fit-out is special rate integral features, which attract a 50% first-year allowance instead. Fixed partitions do not qualify at all; only partitioning that is moveable and intended to be moved. And the trap on incentives: works funded by a landlord’s capital contribution are not your qualifying expenditure, so the contribution can quietly cost you the allowances. The main rate writing-down allowance also fell from 18% to 14% in April 2026, which makes the allocation worth more care than it used to be.

Overstated

“Use Newbigin v Monk to stop paying rates during the fit-out”

The case is real and the reduction in it was from £102,000 to £1, which is why it gets quoted. But it turned on the building having been stripped back to the point of reconstruction rather than repair. A Cat B fit-out on a serviceable Cat A floor, where the services are live and the space could be occupied, will not normally get near that threshold. What is worth knowing instead is that the empty-rates reset period went from six weeks to thirteen in April 2024, and that from April 2026 there is a new high-value multiplier of 50.8p for rateable values of £500,000 and above — which catches a great many Central London floors.

The services this page keeps pointing at

All free to start, and each answers the part of the problem this page can only flag.

Dilapidations — the schedule is not the claim

For commercial tenants at lease end. What a schedule of dilapidations is actually worth once scope, supersession and the section 18 cap are applied — and the cases where it is worth nothing at all.

Your schedule reduced head by head, with the diminution cap testedfree, or £650 for a strategy note →

Commercial lease & occupancy cost audit

For businesses. Rent is barely 60% of what a lease costs. The rest is service charge, rates, energy and a dilapidations bill nobody provisioned for.

Whole-life cost of your lease, and the dilapidations exposurefrom £1,250 →

Business rates assessment & challenge

For businesses. The 2026 revaluation put rateable values up 19.6%. If the survey was wrong before, it is now wrong by more.

Your 2026/27 bill and every route to reduce itfree, or 25% of what we save →

Rent review — what the clause actually says

For business tenants facing an open market review. The money is in the assumptions and the disregards, not the headline figure — and one missed counter-notice can hand the landlord its own number.

Your clause audited, what is at stake over the whole term, and the deadlinefree, or £450 for a clause audit →

Business lease renewal — the 1954 Act

For business tenants at the end of a protected lease. The rent is a valuation and the application deadline is jurisdictional — miss it and the court cannot help you, however good your case.

Your deadline, the grounds tested, compensation and interim rentfree, or £950 for the rent position →

Building safety & fire compliance

An outsourced building safety function for freeholders, RTM companies and managing agents.

Compliance calendar — every documented check a building needsfrom £2,400 a year →

Questions people actually ask

Between £148 and £359 a square foot, on the most recent published London benchmarks. Those are Cushman & Wakefield’s figures from its UK office fit-out cost guide, dated 24 March 2026: £148 for a basic specification, £243 for a collaborative one, and £359 for an advanced one. Their definitions matter: basic means broadly equal desk positions with under 10% meeting facilities and low-specification finishes; collaborative means 10 to 20% meeting space and part single-glazed partitions; advanced means over 25% meeting facilities, double-glazed partitions, dedicated air conditioning and comprehensive sustainability certification. Read what is inside those numbers, because it is more than people assume. On the same methodology the all-in figure is built from four components in stated proportions: the fit-out itself at 45 to 65%, furniture at 15 to 25%, professional services at 10 to 20%, and audio-visual and IT at 7 to 15%. So furniture, AV, design and project management fees are already in the rate. Do not add them again, which is a common way of double-counting a budget. Two honest gaps. The guides do not state whether the rates are exclusive of VAT, so assume exclusive and check the full document. And there is a currency error circulating in the trade press: the European edition of the same guide prices London at €2,668 per square metre for a medium specification, and at least one report has repeated that as “£2,668”. It is euros.

Broadly: Cat A is the landlord’s baseline, Cat B is your workspace, and Cat A+ is the landlord doing some of your job and usually recovering it in the rent. Shell and core is the base building only — structure, envelope, and services brought to the floor but not distributed. Cat A is the landlord’s finished-but-empty floor: raised access floors, suspended ceilings, basic lighting, mechanical and electrical services distributed to the floor, fire detection and suppression, and WCs. It excludes partitions, workstations, meeting rooms and kitchens. Cat A+ adds generic, non-bespoke elements — partitioned meeting rooms in neutral finishes, a tea point, completed flooring — so a tenant can move in quickly. Cat B is the bespoke workspace: partitioning, finishes, joinery, feature lighting, audio-visual, IT, furniture and signage. Now the important caveat, and it is the reason the tool on this page does not use these categories. No professional or official source publishes a cost per square foot by Cat A, Cat A+ or Cat B. We looked. Cushman & Wakefield, JLL and Turner & Townsend all band their data by low, medium and high specification instead. The definitions above come from a contractor rather than a professional body — the British Council for Offices publishes the authoritative guide to fit-out, and it sits behind a paywall. So anyone quoting you a confident “Cat A costs X per square foot” figure is using a source we could not find, and it is worth asking them which one.

Probably, and the obligation is almost never where people look for it. It can arise from three separate places: the alterations covenant in the lease, the licence to alter, and the yield-up covenant. Most tenants check the lease, which is the least likely of the three — the licence to alter is where reinstatement obligations are usually created, and it is often drafted well after the lease is agreed. The yield-up clause is the sleeper. Wording requiring the premises to be delivered up “in such condition as shall be in accordance with the tenant’s covenants” can revive a reinstatement obligation for alterations far too old to found a separate breach claim. The obligation may be absolute or conditional on notice. If it is conditional, notice has to be given — but absent express stipulation there is no prescribed form: it is effective if a reasonable recipient would have understood what was required, and service of a schedule of dilapidations can itself amount to valid notice. The timing is genuinely unsettled in the authorities, with a respectable argument that an implied term requires notice early enough for the work to be completed by the term date. Plan on the basis that notice will be served. And do not rely on having had consent. Section 19(2) of the Landlord and Tenant Act 1927 expressly contemplates a reinstatement undertaking as a condition of granting consent, so consent and the obligation to undo are designed to coexist.

About 8% of the fit-out cost, on the only professional benchmark we could find. Cushman & Wakefield’s European guide publishes reinstatement as a separate line for each city, and for London its figures work out at 7.8%, 8.0% and 8.0% of the corresponding fit-out cost across the low, medium and high tiers. That consistency is why the tool on this page applies it as a ratio rather than a currency figure — it avoids inventing an exchange rate, and it avoids the reporting error that has been circulating where euro figures were repeated as sterling. Be careful what that number covers. The guide does not state what is inside its reinstatement line. Treat it as a strip-back-to-Cat-A benchmark and not as the cost of a contested dilapidations settlement, which can be a great deal more and which will include repair, redecoration and the landlord’s fees as well. What makes reinstatement worse than an ordinary dilapidations claim is not the raw cost but the legal position: the statutory cap that protects tenants on repair does not apply to it. What makes it better than the worst case is that ordinary principles of proportionality still do — a landlord cannot recover the cost of works that would be wholly disproportionate to the benefit. The practical point is timing. The bill arrives at lease end or at a break, which is precisely when a business has least appetite to spend on premises it is leaving.

No, and this is the most consequential misunderstanding in the whole area. Section 18(1) of the Landlord and Tenant Act 1927 caps damages for breach of a covenant “to keep or put premises in repair” during the term, or “to leave or put premises in repair” at the end, at the amount by which the landlord’s reversion has fallen in value. It is the argument that carries most dilapidations negotiations, because a landlord who is about to redevelop or re-let regardless has often suffered very little. The RICS professional standard on dilapidations puts the position in terms: section 18(1) “does not apply to breaches of what are termed as ‘non-repair’ type lease obligations, including for example obligations relating to decoration, removal and reinstatement”. So the diminution argument is not available against a failure to reinstate. The practical consequence is stark: a tenant who can show there was no loss in value still has no defence on reinstatement. Do not overcorrect, though, because the usual shorthand overstates it in the other direction. “There is no cap on reinstatement” is wrong too. Damages are assessed on ordinary common law principles measuring actual loss. Prima facie that is the cost of the works, but where reinstatement would be unreasonable — cost wholly disproportionate to the benefit obtained — recovery is limited to the reduction in the value of the reversion. So you lose the statutory cap and keep a proportionality argument. That is materially weaker, not hopeless.

No time at all, and this is the point most fit-out guides get wrong. The Landlord and Tenant Act 1988 — which imposes a duty to respond within a reasonable time, to give written reasons for refusal, and which makes damages available — applies only to covenants against assigning, underletting, charging or parting with possession. Its section 3 covers a superior landlord’s approval of the same transactions. It does not apply to alterations at all. What applies instead is section 19(2) of the Landlord and Tenant Act 1927, which implies into a qualified covenant against improvements a proviso that consent must not be unreasonably withheld. Note what that does and does not give you. There is no statutory deadline. There is no duty to give reasons, and the landlord may later rely on operative reasons it never disclosed. The burden of proving unreasonableness is on you. And damages are not available — the remedy is a declaration from the County Court or High Court, which is slow, expensive and will not rescue a construction programme. Two further limits worth knowing. Section 19(2) applies only to qualified covenants and does not convert an absolute prohibition into a qualified one. And “improvement” is judged from the tenant’s point of view rather than the landlord’s. The practical answer is to treat consent as a programme risk, start it early, and submit a complete application first time.

They are taxed completely differently, and the right answer depends on your own position rather than on which looks bigger. A rent-free period moves no cash. It is not a reverse premium, and where it is given to extend a lease or remove a break it is not a supply for VAT. A capital contribution is a monetary reverse premium. It is taxed on the tenant as income, spread over the term of the lease. Then the trap that decides most of these. You cannot claim capital allowances on works funded by the landlord. Where the contribution is matched against qualifying expenditure the receipt is broadly neutralised — but the allowances have gone, and the landlord can claim them on its own contribution instead. Where the items would have attracted first-year allowances, the timing can be punishing: the tenant can end up effectively taxed on the whole inducement in year one. One VAT point that catches people. A rent-free is outside the scope for want of consideration — unless it is really barter, where the tenant is doing works that are properly the landlord’s obligation in exchange for the free period. Then VAT is due on the value of those works. A cash contribution is generally outside the scope too, provided the tenant does no more than accept the lease terms; it becomes taxable if the tenant supplies something extra. We are not going to give you a rule of thumb for how much a landlord will fund, because we could not find a professional source that publishes one, and inventing a percentage would be worse than useless in a negotiation.

You become a client in law, twice over, and neither role can be delegated by paying somebody else. First, under the construction regulations. A fit-out is construction work — the definition expressly covers alteration, renovation and the installation of mechanical and electrical services in a structure. The client is whoever the project is carried out for, so a tenant procuring its own fit-out is the client, and there is no size threshold. Your duties are to make suitable arrangements for managing the project, appoint people with the right skills, allow adequate time and resources, provide pre-construction information, ensure a construction phase plan exists before work starts, and ensure a health and safety file is prepared. Where there is more than one contractor you must appoint a principal designer and a principal contractor in writing — and if you do not, you hold both roles yourself. A project is notifiable to the regulator where it will last more than 30 working days and involve more than 20 people at once, or where it exceeds 500 person-days. Second, under the building regulations. Since 1 October 2023 there is a parallel dutyholder regime — client, principal designer, principal contractor, designers and contractors — aimed at regulatory compliance rather than site safety, with competence requirements attached. It applies to all building work requiring approval, not only to tall residential buildings, which is the commonest misreading of the Building Safety Act in a commercial setting. And fire safety duties run during the works, with the tenant, landlord and principal contractor often all responsible persons at once.

You need one, and the landlord’s is almost certainly the wrong type. There are two. A management survey is non-destructive. It supports the asbestos register and the management plan for a building in normal occupation, and it is what a landlord will hand you. A refurbishment and demolition survey is intrusive. The regulator’s guidance is that this type of survey “must locate and identify ACMs, including those hidden within the building fabric, before any structural work begins”, and the surveyor must confirm the area fit for reoccupation afterwards. So a management survey is not authority to start opening up ceilings, floors or walls. The guidance goes further: “there is a legal requirement for all ACMs to be removed, as far as reasonably practicable, before major refurbishment or demolition”. Two practical consequences for your programme. The survey has to cover the actual work areas rather than the building generally, which means it cannot be commissioned until the design is far enough advanced to know where you are cutting. And it is pre-construction information which you, as client, are obliged to provide to your designers and contractors — so it sits on the critical path rather than beside it. Budget for the possibility that it finds something. Removal is licensed work with its own programme implications, and it is the commonest single cause of a fit-out slipping in an older building.

Usually not, and this is one of the most over-claimed points in fit-out marketing. The case everybody cites is Newbigin v S J & J Monk, decided by the Supreme Court in 2017, where an assessment was reduced from £102,000 to £1. It held that the statutory assumption that premises are in reasonable repair cannot displace the reality principle where the property is genuinely undergoing reconstruction rather than repair. Read what that building was. It had been stripped out to the point where replacing its major elements would go beyond any meaning of repair. A Cat B fit-out on a serviceable Cat A floor will not normally get near that threshold — the services are live, the space is capable of occupation, and you are adding to it rather than reconstructing it. Anyone promising you a rates holiday for an ordinary fit-out is overselling the case. What is worth knowing instead. Empty property relief gives three months free of rates after a property becomes empty, six for industrial, with an indefinite exemption where the rateable value is below £2,900. The reset period — the occupation needed before a fresh empty period can run — went from six weeks to thirteen weeks in England on 1 April 2024, and older advice still says six. And the change that matters most in Central London: a revaluation took effect on 1 April 2026 and England moved to five multipliers, including a new high-value multiplier of 50.8p for rateable values of £500,000 and above, against a standard multiplier of 48.0p.

No. That requirement has been abandoned, and a great deal of published advice has not caught up. On 18 June 2026 the government published an interim response to its consultations on minimum energy efficiency standards in the non-domestic private rented sector. It confirmed that “the previously proposed interim EPC C milestone for 2027 will not be taken forward”. What replaced it is a proposal that from 2031, privately rented buildings over 1,000 square metres in England and Wales will need to reach EPC B, where cost effective. Buildings under 1,000 square metres remain at EPC E with no announced uplift date. Existing flexibility is retained, including the seven-year payback test and the exemptions regime. Now the part to be precise about. That is an interim consultation response, not law. The changes take effect only on the passage of secondary legislation, and none has been made. The government says it aims to legislate at the earliest opportunity. So the binding minimum for continuing to let commercial premises today is still EPC E, and F and G rated properties must be improved or hold a valid registered exemption. Where energy requirements do bite on a fit-out right now is in the lease, not the statute. Green lease clauses increasingly require tenants to consider the effect of their works on the rating, to use sustainable materials and to share energy data — and operational rating schemes measure how the building actually performs, so works that degrade base-build performance can damage the landlord’s rating.

No, and we would rather say so plainly than let a services page imply otherwise. We are a property consultancy. The construction is done by specialist fit-out contractors, and there are very good ones in London — the market is competitive and you should tender it. What we do is the property side, which is the half of this transaction that is decided before a contractor is ever appointed and which nobody on the construction side is engaged to look after. Specifically: the reinstatement position and the terms of the licence to alter, negotiated before the specification is fixed rather than after; the incentive structure, including whether you should be taking a rent-free period or a capital contribution given your own tax position; the heads of terms generally, including break conditions that a reinstatement obligation can defeat; and the dilapidations exposure at the far end, which is where a fit-out decision made in year one is finally paid for. Why we are being explicit about the boundary. The previous version of this page read as though we delivered design and construction, and listed contractors alongside ourselves as though we were the same kind of business. We are not, and describing a business as something it is not is exactly the sort of thing the consumer protection rules bite on. If you want a contractor recommendation we will give you several and tell you what we think of each — but the work you should be paying us for is the lease, not the ceiling.

Get the reinstatement position in writing before you agree the specification.

The order matters more than anything else here. Once the licence to alter is executed, the reinstatement obligation is fixed and your negotiating position has gone — you are then designing against a liability you have already accepted. Settled first, it is a term to be traded like any other, against the rent-free, the contribution or the break. Send us the floor plan, the heads of terms and the draft licence, and we will tell you what the far end of it costs before you commit to the near end.

Send us the floor and the lease