Updated October 2026 · Fraser Bond
Construction service
Renovating Your London Home
Should you move out?
For kitchens, rewiring or structural work, moving out for a few weeks usually makes the job faster and cheaper. For phased cosmetic work you can often stay.
Budget and contingency
Older London houses hide surprises (rotten joists, old wiring, damp). Hold 10–15% contingency and decide early which items you can trim if needed.
Neighbours and party walls
Work on or near a shared wall, or excavation near a neighbour's foundations, usually needs Party Wall Act notices. We serve these early so they do not hold up the start.
What Fraser Bond does on building projects
- Site visit and a clear scope of works
- Design, drawings and specification
- Written, itemised quote and programme
- Planning, building control and landlord or freeholder consents
- Managed works with one point of contact
- Snagging, completion certificates and handover
How it works
Illustrative only. Get builders' quotes and a Level 3 survey.
Frequently asked questions
Keep exploring
New-Build Houses in London: A Buyer's GuideDEVELOPMENT GUIDE
New-Build Developments in West London: A Buyer's GuideDEVELOPMENT GUIDE
How to Become a Property Developer: A Practical Guide
Browse every guide in The London Property Investor's Hub → · London area guides →
Handy tools
Stamp duty calculatorRental yield calculatorMove-in costsBTL deposit calculatorRefurb cost per m²
Ask us about end values and letting new homes.
How long does a full house renovation take?
Often 3–6 months on site for a typical terraced house, after design and approvals.
Do I need planning permission?
Not for most internal work, but extensions, lofts, windows in conservation areas and listed buildings often do.
Talk to us about your home
Send us the address and what you need. We will arrange a visit or call and give you a written quote.
Request a quoteOur property services