Updated October 2026 · Fraser Bond
Construction service
Refurbishing Multi-Occupancy Buildings
Standards to design to
Minimum room sizes (6.51m² for one adult sleeping), enough kitchens and bathrooms for the number of occupants, fire doors, detection and alarms, and protected escape routes. Councils publish their own amenity standards.
Phasing occupied buildings
Work floor by floor or flat by flat, keep escape routes open and give residents notice of noisy work.
After the works
We can apply for or renew the HMO licence, let the rooms and manage compliance.
What Fraser Bond does on building projects
- Site visit and a clear scope of works
- Design, drawings and specification
- Written, itemised quote and programme
- Planning, building control and landlord or freeholder consents
- Managed works with one point of contact
- Snagging, completion certificates and handover
How it works
Illustrative only. Get builders' quotes and a Level 3 survey.
Frequently asked questions
Keep exploring
New-Build Houses in London: A Buyer's GuideDEVELOPMENT GUIDE
New-Build Developments in West London: A Buyer's GuideDEVELOPMENT GUIDE
How to Become a Property Developer: A Practical Guide
Browse every guide in The London Property Investor's Hub → · London area guides →
Handy tools
Stamp duty calculatorRental yield calculatorMove-in costsBTL deposit calculatorRefurb cost per m²
Ask us about end values and letting new homes.
Do I need planning permission for an HMO?
Small HMOs (3–6 people) can be permitted development unless an Article 4 direction applies, which is common in London. Large HMOs need planning.
Can you manage the HMO after?
Yes, Fraser Bond offers HMO lettings and management.
Refurbishing an HMO or block?
Send us the address and what you need. We will arrange a visit or call and give you a written quote.
Request a quoteOur property services