EPC, MEES & energy retrofit management

You get £10,000 a property. Spend it in the wrong order and you land at D with nothing left.

Privately rented homes must reach EPC C by 1 October 2030, with a £10,000 cap per property and penalties of up to £30,000 per breach. Spending from 1 October 2025 already counts toward that cap — so money you have spent badly has already been taken off your allowance. The deadline is not the hard part. The sequence is.

The numbers that set the budget

£10,000Cap per property per ten years. Grant funding counts against it — with one important exception, below.
1 Oct 2025Spend from this date already counts, including the EPC itself and specialist retrofit advice.
£30,000Maximum penalty per breach, per property. Six times the old £5,000 domestic maximum.
£7,500Boiler Upgrade Scheme grant. Only your net cost after it counts against the cap, which makes it the most valuable pound in the plan.

Two regimes, moving apart for the first time

Until this year domestic and commercial minimum standards tracked each other. They no longer do, and owners with both in a portfolio are the ones most likely to plan against the wrong deadline. Here is where each actually stands.

Privately rented homes

EPC C by 1 October 2030

A single deadline for all tenancies — the earlier proposal to bring new tenancies forward to 2028 was dropped. And it is no longer one band: the property has to meet a primary fabric performance standard, then a secondary standard on either the heating system or the smart readiness metric, at your election.

TodayEPC E to let, unless a valid exemption is registered
Cost cap£10,000 per property, reviewed every five years after 2030
Low valueProperties under £100,000 spend 10% of value instead
ExemptionCap reached without hitting the standard registers a 10-year exemption
GrandfatheringA C or better issued before 1 Oct 2029 holds good until it expires
PenaltyUp to £30,000 per breach, per property
Commercial property

EPC B by 2031 — but only above 1,000 m²

The government confirmed the B target for larger buildings and dropped the interim EPC C by 2027 deadline that everyone had been planning around. Below the threshold there is no new target at all, which changes the investment case on a lot of small commercial stock overnight.

TodayEPC E to let or continue letting, F and G unlettable
Over 1,000 m²EPC B from 2031, where cost effective
Under 1,000 m²Stays at E, with no announced future target
DroppedThe proposed EPC C by 2027 interim step is gone
TestThe seven-year payback test and existing exemptions survive
PenaltyUp to 20% of rateable value, capped at £150,000
The EPC itself is being rebuilt, and it slipped

The replacement of SAP and RdSAP with the Home Energy Model, and the move from one band to separate fabric, heating, smart readiness and cost metrics, was going to land in October 2026. It has been pushed to the second half of 2027, with the exact date still to be set and the familiar A–G band expected to retire around October 2029. That matters for planning: a certificate you commission now is assessed under the old methodology, and a comfortable C today is not a guaranteed C under the new one. It is a reason to build fabric margin into the plan rather than to stop and wait.

Build the plan

Tell us what the property is and we will sequence the work — cheapest route to the target first, measured against the cap, with the grant applied where it belongs. Nothing is sent anywhere.

SAP
£
Where this property lands

Start with the band

Answer down the left and the plan builds here — ordered by cost per point, priced, and measured against the cap.

–
→
–
Projected band after the planBased on typical point gains for a property of this type and age.
Against the £10,000 cap£0

Nothing committed yet.

Costs are typical 2026 installed ranges and point gains are indicative. A real plan is built off the property’s actual assessment data, not its band — which is exactly the gap this tool is showing you.

Assessment through to handover, on one instruction

Most owners end up managing this themselves across an assessor, three contractors and a funder, none of whom is accountable for the outcome. We take the whole chain, and the number we are judged on is the band at the end of it.

Assess

What you actually have

A current EPC, the underlying assessment data rather than the headline band, and a fabric survey where the walls are in doubt. Portfolio-wide we pull every certificate and rank the stock so you can see the stranded assets before you spend anything.

Plan

A costed route, in the right order

The measures that get this property to the target for the least money, sequenced so that fabric goes in before anything that depends on it, priced at real contractor rates, and set against the cap and the grants you qualify for.

Fund

Every pound that is not yours

Boiler Upgrade Scheme, the schemes running under the Warm Homes Plan, and local authority funding, applied in the order that protects your cap. Getting the sequence of funding wrong is how landlords burn their allowance on work a grant would have covered.

Procure

Contractors who will still be there

Tendered, certificated and insured, with the certification the funders and the assessor will ask for later. Scope written so the assessor can evidence what was installed — work that cannot be evidenced does not move the rating.

Manage

The works, and the tenants in them

Programme, access, sequencing around occupation, snagging and sign-off. Where the property has to be empty we plan the void deliberately rather than discovering it halfway through.

Certify

The new EPC, and the evidence behind it

A fresh assessment on completion, lodged, with the installation records held so the rating can be defended. If the property lands short of the target having exhausted the cap, we register the exemption properly — which is a result, not a failure.

What it costs

An assessment and costed plan first, priced as a fixed fee. The works are quoted at contractor rates with our management charged as a percentage, and you will see both numbers separately — never rolled into one figure you cannot interrogate.

Assessment and plan
£395fixed fee, one property
Current EPC and the underlying assessment data, not just the band
A costed, sequenced route to the target
Measured against the £10,000 cap and the grants you qualify for
A clear answer on whether an exemption is the right outcome
Portfolio
£250per property, from
The same plan per property at portfolio rates
Stock ranked by cost per band-point, so you spend in the right order
Tenancy events and void windows built into the programme
A single capital plan you can take to a lender or a board
Running the works
8–12%of works value
Contractors tendered, certificated and insured
Grants applied in the order that protects your cap
Programme, access and tenant liaison managed
New EPC commissioned and lodged on completion, with the evidence retained

We take no commission from any contractor or installer and will say so in writing. Works are quoted at the contractor’s price and our percentage is visible on top of it. For reference, 2026 market rates run roughly £60–£120 for a domestic EPC and £120–£200 for an EICR on a two-bed flat, with London 15–30% higher. Remember that spend on energy efficiency from 1 October 2025 already counts against your £10,000 cap — including the cost of the EPC and of specialist retrofit advice.

Get a costed plan. It takes about thirty seconds.

Send us the address and the current EPC band and we will tell you roughly what it takes to reach the target, before you pay for anything. No card and no obligation.

Usually within a few hoursMonday to SaturdayFree to askQuote before anything startsNo lock-inCancel monthly services any time

Get the plan priced

Four questions. We will come back with what your stock looks like against 2030, where the money should go first, and what we would charge to run it.

Step 1 of 4

What are we looking at?

The work is the same shape at any scale. The order you do it in is not.

Please choose one.

What do you need from us?

Choose as many as apply. Most owners start at one end and end up wanting the whole chain.

Please choose at least one.

Where is the stock?

Areas or postcode districts is plenty. Local authority funding varies more than people expect.

Please tell us roughly where it is.

Who shall we come back to?

No charge for the conversation. If your stock is already compliant we will tell you and leave you alone.

Please give us a name and a way to reach you.

Here is what we will send

Check it over. Tapping the button opens WhatsApp with this ready — nothing has been sent yet.

Send this on WhatsApp

Related services

Every one of these has a free tool on it. None of them asks for your details before it gives you an answer.

Questions owners ask us

No, and this is the most expensive mistake available in 2026. The methodology change slipped from October 2026 to the second half of 2027, but the deadline did not move — it is still 1 October 2030, and the cap still counts spend from 1 October 2025. Waiting buys you nothing and costs you two things: contractor capacity, which will tighten sharply as every landlord in the country converges on the same date, and optionality, because the measures that are cheap now are cheap under any methodology. Loft insulation does not become a bad idea because the scoring changed. What the reform should change is emphasis: build fabric margin rather than scraping a C on heating alone, because fabric is the primary metric.

Mostly yes, which surprises people. Third-party and grant funding generally counts toward the cap, so a £4,000 local authority grant can consume £4,000 of your allowance even though it never left your account. The Boiler Upgrade Scheme is the exception that matters: only your net cost after the £7,500 grant counts. That single rule is why a heat pump frequently beats a new boiler on cap efficiency — roughly £4,000 of cap for a large number of points, against £3,000 of cap for far fewer. Sequencing the funding is not administrative tidiness; it is the difference between reaching C inside the cap and not.

Then the answer is an exemption, registered properly, and that is a legitimate outcome rather than a failure. Spend to the cap, evidence what you spent it on, and register — a cost cap exemption runs ten years. There is also a negative-impact exemption where measures would damage the fabric, a solid wall exemption, and a value adjustment for properties worth under £100,000 which reduces the required spend to 10% of value. What we would also say honestly is that an exemption manages the compliance problem without managing the asset problem. A property that cannot reach C is a property with a narrower buyer pool in 2029 than it has today, and that is worth confronting while you still have four years of options.

Yes, and mostly in your favour if your buildings are small. The government confirmed EPC B from 2031 but only for buildings over 1,000 square metres, and it dropped the proposed EPC C by 2027 interim step entirely. Below the threshold the standard stays at E with no announced successor. This is the first time non-domestic MEES has not tracked the domestic target, and a lot of owners are still budgeting against a 2027 deadline that no longer exists. The seven-year payback test survives, which means your obligation is bounded by what the measures actually save rather than by what they cost.

Both, and the second is worth much less without the first. We assess, plan, secure the funding, tender the work, manage the programme around your tenants and commission the new certificate at the end. The reason we run the whole chain is that the failure mode in retrofit is almost never the individual measure — it is the handover between the assessor who did not see the installation, the installer who did not keep the certification, and the second assessor who therefore cannot credit the work. Points you cannot evidence do not exist.

Not by how bad they are, which is the instinctive answer and usually the wrong one. We rank by cost per band-point and by how close the property sits to a threshold, because a D at the top of the band may cost a tenth of what a low E costs to move. Then we overlay the things that override arithmetic: tenancies ending, buildings falling vacant, works you were doing anyway, and grant windows that close. On a portfolio of any size the sequencing is worth more than the negotiating on any individual contract.

Four years is not long for a portfolio, and the contractors are not getting cheaper.

Every landlord in the country is working to the same date. The ones who plan in 2026 will pay 2026 prices and choose their contractor; the ones who wait until 2029 will pay whatever is left and take whoever is free. Start with knowing where your stock actually stands.