Home  /  Search Listings  /  Advanced Search

Advanced Search

Property Subtype
Listings
Home  /  Search listings  /  Land for sale and to lease
For landowners, developers and investors

Land for sale and to lease

Two things changed in 2026 that move the arithmetic on land, and a great deal of advice still in circulation predates both. Biodiversity Net Gain was rewritten on 6 August 2026, with a new exemption for sites inside a 0.2 hectare red line and the self-build exemption removed. And from 6 April 2026 agricultural and business property relief is capped — 100% relief on the first £2.5 million, and 50% above it. If your land plan was built before Christmas, it needs rerunning.

0.0 haNew BNG exemption, measured to the red line
£0Where 100% agricultural and business relief now stops
6 Aug 2026When the BNG rules changed
£0What you pay us
Search
What this means for you

What we establish before a site reaches this page.

🌱

The BNG position under the rules as they now are

The regulations changed on 6 August 2026. Sites within a 0.2 hectare red line are exempt unless onsite priority habitats are affected, wholly temporary permissions of five years or less are exempt, and the self-build exemption is gone. Applications already submitted keep the old position. We tell you which side of that line the site sits.

🔑

Access, and whether anyone can hold it to ransom

A site with no adequate access is not a site. We establish the legal right of access, its width and its permitted use, whether a ransom strip exists, and whether the highway authority will accept the junction — before anyone spends money on a scheme.

📈

Overage, and how it is actually drafted

On most land sales the overage is worth more than the argument about price. Trigger, duration, percentage, valuation basis, deductions for cost and planning gain, and whether it binds successors. We get it right at heads of terms because it cannot be fixed afterwards.

✉

You pay us nothing

Our fee is paid by the vendor. No acquisition fee and no retainer — and no reason for us to be quiet about a title problem that will surface in due diligence anyway.

FOR SALE
£ 85,000.00
5.5 Acres Meadowland Near Bath – Strategic Land Investment Opportunity
United KingdomSomersetBath
FOR SALE
US$ 800,000.00
Prime Development Land for Sale – La Misère, Mahé, Seychelles
SeychellesVictoriaMahe
FOR RENT
£ 80,000.00 (Per Year)
Strategic Freight Site – 76,423 sq ft Land and Storage – Washington, North East England
United KingdomTyne y WearSunderland
FOR RENT
£ 12,000.00 (Per Year)
Kings Heath – Land for Lease | High Street/Alcester Road, Birmingham, B14 7SN
United KingdomWest MidlandsBirmingham
FOR RENT
POA (Per Year)
Land at 3 Colts Corner, Off Cheshire Road – Rail Freight Site for Lease
United KingdomBristolBristol
Market intelligence
What should you actually be paying?
Lower quartile, median and upper quartile per sq ft for every London submarket with a large enough live sample — with the instruction count behind every row.
See the rent evidence →
FOR RENT
£ 42,000.00 (Per Year)
95 Wellfield Road – Land for Lease – 10,500 sq ft – Streatham, SW16 2BY
United KingdomGreater LondonLambeth
FOR RENT
POA (Per Year)
Rail Sidings Adjacent to Priory Way – 43,140 sq ft Rail Freight Site – Hull, HU4 7DY
United KingdomEast YorkshireHull
FOR RENT
POA (Per Year)
Land off Freightliner Road – 270,000 sq ft Rail Freight Site – Hull, HU3 4XR
United KingdomEast YorkshireHull
FOR RENT
POA
Land off West Dock Road, Harwich International – Rail Freight Yard
United KingdomEssexHarwich
FOR RENT
£ 46,500.00 (Per Year)
Land on the East Side of Lamberts Place – East Croydon, CR0 2BR
United KingdomGreater LondonCroydon
FOR RENT
POA
Eaglescliffe Rail Freight Site – County Durham, TS16 0BT
United KingdomDurhamDurham
FOR RENT
POA (Per Year)
Belford Ex-Strategic Freight Site – Land & Rail Freight Site for Lease
United KingdomNorthumberlandBelford
FOR RENT
POA
Land off Brownedge Road – Land for Lease – Bamber Bridge, PR5 6UP
United KingdomLancashirePreston
FOR SALE
POA
Andover Up Yard – Rail Freight Site – 103,333 sq ft – Mylen Road, Andover, SP10 3HE
United KingdomHampshireAndover
FOR SALE
POA
Station Road, Truro – Residential Development Opportunity – 1.75 Hectares
United KingdomCornwallTruro
FOR SALE
POA
Brownfield Development Site – Residential Development Opportunity – Basingstoke, Hampshire
United KingdomHampshireBasingstoke
How this works with us

From first message to keys.

Tell us the strategy, not just the size

Immediate development, a promotion or option play, a strategic hold, or an operational site for freight or storage. Each runs into different diligence and a completely different tax position on exit.

We send sites with the constraints established

Title and rights of way, access and highways position, planning history and designations, BNG exposure under the current rules, ground conditions and previous uses, and services capacity.

We structure the deal around what is unknown

Conditional contracts, options, promotion agreements, overage and clawback. Where the value depends on a consent nobody has yet, the structure is the deal — and it is far more negotiable than a headline price.

Worth knowing before you commit

What decides whether a land deal works.

Biodiversity Net Gain was rewritten on 6 August 2026

The amended regulations introduced a new exemption for small sites: development is exempt where the area within the planning application red line boundary is no more than 0.2 hectares, unless the development would negatively affect onsite priority habitats. The measurement is the red line, not the developable area, which means how the application is drawn can decide whether BNG applies at all.

Wholly temporary development permitted for five years or less is now exempt, provided the whole development is temporary and the land is reinstated within the period. The separate self-build and custom build exemption has been removed for applications submitted on or after 6 August 2026, though such schemes may still fall within the small sites exemption. And for minor development, onsite habitat creation and registered offsite gains can now be considered together, so applicants no longer have to exhaust onsite options first — statutory credits remain the last resort.

Transitional arrangements matter more than the new rules for anything already in the system. Applications received before 6 August 2026 keep their original BNG requirements even if validated afterwards, and a section 73 variation generally follows the original permission’s BNG status rather than picking up a new exemption. If you are buying a site with a live application, establish which regime it sits under before you price the scheme.

The relief change that reprices strategic land holding

From 6 April 2026, agricultural property relief and business property relief no longer give unlimited 100% relief from inheritance tax. The 100% rate now applies to the first £2.5 million of combined agricultural and business property, with 50% relief above that. The allowance is transferable between spouses and civil partners, giving a couple up to £5 million, and it refreshes every seven years.

Watch the figure carefully, because a great deal of published commentary is out of date. The original announcement at the Autumn 2024 Budget set the allowance at £1 million. It was raised to £2.5 million in an announcement on 23 December 2025, before taking effect on 6 April 2026. If you are reading advice that says £1 million, it was written before that change — and the difference is material on any holding of scale.

Two related points. Trusts holding qualifying property before 30 October 2024 each get their own allowance, while trusts created after that Budget by the same person share one allowance allocated chronologically. And the option to pay inheritance tax by ten interest-free annual instalments has been extended to cover all assets qualifying for either relief, which changes the cash-flow question even where the tax itself is unavoidable.

Access, and the ransom strip

A site without adequate legal access is not a development site, whatever the planning position. Three things need to be established separately: that a legal right of access exists, that it is wide enough and permits the use you intend rather than only agricultural or residential access, and that the highway authority will accept the junction and any visibility splay required.

Where a third party controls a strip of land between the site and the public highway, they control the development. The convention in valuing such a ransom strip has long run to a substantial share of the uplift released — the figure most often cited derives from the approach taken in Stokes v Cambridge, and while it is a starting point rather than a rule, it gives an idea of the exposure. Establish who owns every metre between the site and the highway before you commit, not after a promoter has spent a year on the application.

Overage is where the value actually sits

On any land sale where a future consent might increase the value, the overage provisions matter more than the price. Six things need deciding and all six are negotiable: the trigger (grant of permission, implementation, or disposal with the benefit of it), the duration, the percentage of uplift, the valuation basis, the deductions allowed for costs, section 106 and CIL, and the security — a restriction on the title, a legal charge, or a positive covenant with a chain of indemnity, since positive covenants do not run with freehold land.

The two most common failures are a trigger drawn so tightly that a variation of an existing permission escapes it, and security that does not survive a sale by the buyer. Neither is fixable once the transfer is executed. If you are the seller, spend on the drafting rather than on the negotiation over headline price.

Options, promotion agreements and conditional contracts

Three structures dominate strategic land, and landowners frequently sign the wrong one. Under an option, a developer takes the right to buy at a future date, usually at a discount to market value, and the developer’s interest is in keeping the price down. Under a promotion agreement, a promoter funds the planning process and takes a share of the eventual sale proceeds on the open market, so their interest is aligned with yours in getting the highest price — but you sell to a third party rather than to them.

A conditional contract is a sale that completes when a defined condition is met, usually a satisfactory planning permission, and turns on how ‘satisfactory’ is defined. Alignment of interest is the question to ask of all three: under an option the developer profits from a lower price, under a promotion agreement they profit from a higher one, and under a conditional contract the definition of the condition decides who carries the planning risk.

Operational land: freight, storage and yards

Land let for operational use is a different asset from land held for development. Rail freight sites, open storage yards and roadside plots turn on access, surfacing, drainage and consent for the use — storing goods in the open is a material change of use, and land previously agricultural or vacant needs permission for it.

Then the liabilities. Surface water discharge and drainage consents. Contamination, where Part 2A of the Environmental Protection Act 1990 pursues whoever caused it first but reaches the current owner or occupier where the original polluter cannot be found. And on a lease, the reinstatement obligation at the end — on a yard that can mean removing surfacing and hardstanding you inherited, so establish it in writing at heads of terms rather than discovering it in a terminal schedule.

Common questions

What buyers ask us most in this category.

It depends on the site and on when the application was made. Since 6 August 2026 development is exempt where the area within the planning application red line boundary is no more than 0.2 hectares, unless onsite priority habitats would be affected, and wholly temporary development permitted for five years or less is also exempt. The self-build exemption was removed on the same date. Critically, applications received before 6 August 2026 keep their original requirements even if validated later, and a section 73 variation generally follows the original permission. Establish which regime applies before you price a scheme.

From 6 April 2026, 100% relief applies to the first £2.5 million of combined agricultural and business property, with 50% relief above that. The allowance is transferable between spouses and civil partners, so a couple can shelter up to £5 million, and it refreshes every seven years. Be careful with older commentary: the original announcement set the figure at £1 million and it was raised to £2.5 million on 23 December 2025. Anything written before then understates the allowance substantially. The instalment option has also been extended to all assets qualifying for either relief.

It is land controlled by a third party sitting between a development site and the public highway, or between the site and services. Whoever owns it can block the development, and the convention in valuing that position has long run to a substantial share of the uplift released — the commonly cited proportion derives from the approach in Stokes v Cambridge, and it is a starting point for negotiation rather than a fixed rule. The practical answer is to establish ownership of every metre between the site and the highway before committing, because the price of the strip rises sharply once a promoter has invested in an application.

The question to ask of either is whose interest is aligned with yours. Under an option a developer acquires the right to buy at a future date, usually at a discount to market value — so their interest is in the price being lower. Under a promotion agreement a promoter funds the planning process and takes a share of the proceeds when the land is sold on the open market, so their interest is in the price being higher, though you sell to a third party rather than to them. A conditional contract sits between the two and turns entirely on how a satisfactory planning permission is defined.

Usually the overage rather than the price. Six elements decide what it is worth: the trigger, the duration, the percentage of uplift, the valuation basis, the deductions allowed for costs and planning obligations, and the security. The two most common failures are a trigger drawn tightly enough that a variation of an existing permission escapes it, and security that does not survive an onward sale by the buyer — which matters because positive covenants do not run with freehold land. None of it is fixable after the transfer is executed, so it is worth spending on the drafting.

Can't find what you're looking for?
Our team has access to off-market opportunities that never reach the portals — tell us what you need.
WhatsApp us Contact us