Home  /  Search Listings  /  New build homes for sale in the UK
For new build buyers

New build homes for sale in the UK

A new build comes with protections a second-hand home does not: a ten-year structural warranty, a code the developer has to follow, and an ombudsman who can award up to £75,000. It also comes with risks a resale does not. We act for you, not the developer, and our fee is paid by the seller.

0 Developments currently listed
0 Structural warranty cover
0 Maximum Ombudsman award
£0 What you pay us as a buyer
Property Subtype
What this means for you

What we establish before a site reaches this page.

🛡

A ten-year warranty

Structural cover for a decade, with the first two years covered directly by the builder for defects. A resale gives you none of that.

A code the developer must follow

The New Homes Quality Code sets out your rights on reservation, deposit protection, pre-completion inspection and pressure selling. Awards up to £75,000 through the Ombudsman.

Cheap to run, nothing to fix

New fabric, new systems, an A or B EPC in most cases. No chain above you, and no boiler about to fail in your first winter.

Someone on your side of the table

The on-site sales team works for the developer. We work for you — on price, on incentives, and on what the contract actually commits you to.

Listings
FOR SALE
£ 350,000.00
Trinity Park – A Riverside Sanctuary in Woolwich, Southeast London
United KingdomGreater LondonWoolwich
FOR SALE
£ 775,000.00
Chelsea Riverview, William Morris Way, London SW6 2UG
United KingdomGreater LondonFulham
FOR SALE
£ 460,000.00
King George’s Gate, Bendon Valley, Earlsfield, London SW18 4UQ
United KingdomGreater LondonWandsworth
FOR SALE
£ 645,000.00
The HiLight – Battersea, 110 York Road, London SW11 3RD
United KingdomGreater LondonBattersea
FOR SALE
£ 410,000.00
Prime Point, Greenwich Peninsula, London SE10
United KingdomGreater LondonGreenwich
FOR SALE
£ 630,000.00 (Per Week)
The Wilderly – Zoneside Sanctuary in Central London
United KingdomGreater LondonSouthwark
FOR SALE
£ 299,950.00
UPPER EAST – LANDMARK LIVING IN BROMLEY-BY-BOW, EAST LONDON
United KingdomGreater LondonBromley-By-Bow
FOR SALE
£ 245,000.00
Red Bank Riverside, Manchester – Modern Living Surrounded by Nature | Completion Q2 2027
United KingdomGreater ManchesterManchester
FOR SALE
£ 695,000.00
Modern Riverside Living at Canada Water – The Founding
United KingdomGreater LondonSouthwark
FOR SALE
POA
SEVEN, Southbank Place – An Iconic New Address on London’s South Bank
United KingdomGreater LondonSouthbank
FOR RENT
POA (Per Year)
Refurbished Cross-Docked Warehouse in Prime North London Logistics Hub
United KingdomGreater LondonEnfield
FOR RENT
POA
Southwark Urban Logistics Hub – Future-Ready Central London Distribution Centre
United KingdomGreater LondonSouthwark
FOR RENT
POA
Innovative Vertical Campus with Striking Design – 2 Finsbury Avenue, London
United KingdomGreater LondonCity of London
FOR RENT
POA
The Grand Press, Canada Water – A Monumental Workspace for Ambitious Enterprises
United KingdomGreater LondonCity of London
FOR RENT
POA (Per Month)
Dock Shed,Canada Water–Innovative HQ Workspace with Landmark Architecture and World-Class Amenities
United KingdomGreater LondonSouthwark
FOR SALE
£ 385,000,000.00
1 Triton Square – Central London’s Premier Science and Innovation Hub
United KingdomGreater LondonCity of London
FOR SALE
£ 1,650,000.00
100 Kensington – The Oria, W14 – London Completion: Q1 2027
United KingdomGreater LondonKensington and Chelsea
FOR SALE
£ 750,000.00
*Wimbledon Place, London – Apartments for Sale – Completion 2026**
United KingdomGreater LondonWimbledon
FOR SALE
£ 1,360,000.00
Opus at Bankside Yards, London SE1
United KingdomGreater LondonSouthbank
Can't find what you're looking for?
Our team has access to off-market opportunities that never reach the portals — tell us what you need.
WhatsApp us Contact us
How this works with us

From first message to keys.

Tell us what you are looking for

Area, budget, timing and whether you need to be in by a date. We will send schemes that fit, including allocations released before public launch.

We view it with you

We look at the specification, the service charge, the lease and the developer’s record — not just the show home. You get our honest view, including when it is a no.

We negotiate and see it through

Price, incentives, the reservation agreement and the long-stop date. Then snagging and completion, with us chasing the developer rather than you.

Worth knowing before you commit

What decides whether a site works.

The protections you have

Most major developers are signed up to the New Homes Quality Code, updated in March 2026. It requires a cooling-off period in the reservation agreement, protection of any deposit you pay, a pre-completion inspection you can carry out yourself or have done professionally, and an estimate of your ownership and maintenance costs for the first five years. It also restricts high-pressure selling and time-limited incentives.

Where the code applies, the New Homes Ombudsman can award up to £75,000 on an upheld complaint raised within two years of reservation or completion, whichever is later. Roughly six in ten new homes are covered, so it is worth asking which code the developer is signed up to before you reserve, not after.

A warranty is not a snagging list. Years one and two are usually the builder’s own defects cover; years three to ten are structural only. Anything cosmetic you do not raise early is very likely to become yours.

Off-plan: what you are committing to

Buying off-plan usually fixes the price now for completion later, which is an advantage in a rising market and a problem in a falling one. Three things decide whether it works for you:

  • The long-stop date — the latest the developer can complete before you can walk away and recover your deposit
  • Whether your mortgage offer will still be valid at completion, since most last six months
  • What happens to your deposit if the developer does not finish, and who holds it

Leasehold, ground rent and service charge

Ground rent on new residential leases has been a peppercorn — effectively nil — since the Leasehold Reform (Ground Rent) Act 2022, so any new lease quoting a rising ground rent should be questioned hard. The service charge is the number that actually matters, and it is the one most often underestimated at launch. Ask for the estimate, ask what it excludes, and ask what it was on the previous phase.

Questions we ask that you may not think to

How many units in this phase are already sold, and at what. What the developer’s last three schemes completed like against their original dates. Whether the incentive on offer is genuinely worth more than the equivalent taken off the price — usually it is not, and a lower price helps your valuation while a free kitchen does not.

Common questions

What people ask us most in this category.

No. Our fee comes from the seller or the developer. What that buys you is someone reading the contract and the lease on your side of the table — the on-site sales team, however helpful they are, is employed by the developer.

Less than most buyers assume. The first two years are typically the builder’s own defects cover, which is where snagging is dealt with. Years three to ten are structural only — foundations, frame, roof, that category of problem. Cosmetic issues you do not raise in the first two years generally become your cost, which is why the pre-completion inspection matters.

Different rather than simply riskier. You fix the price early, which helps in a rising market. Against that, completion dates slip, mortgage offers expire, and valuations at completion can come in under the price you agreed. The long-stop date and your lender’s offer window are the two things to get right, and we will check both before you reserve.

Usually the price. Developers prefer incentives because they protect the headline value on the scheme, but a lower purchase price reduces your stamp duty, improves your loan-to-value and helps at valuation. A free kitchen upgrade does none of those things. We will tell you which is genuinely worth more on the specific deal in front of you.

Your position depends on the long-stop date in the contract. Before it, you generally have to wait. After it, you can usually rescind and recover your deposit. Plenty of buyers never check this until it becomes urgent. We read it before you sign, and we chase the developer through the delay rather than leaving you to do it.